Diamond drilling at the high grade Elizabeth sector of the Project has now been completed for the 2020 field season. A total of 12 diamond drill holes were completed totalling 2,006 m (Figure 1). The remainder of the planned 6,000m of drilling will commence in the Canadian spring of 2021. Drill hole information can be found in Appendix 1 of this announcement. The first four drill holes have now been received at SGS laboratory in Burnaby, B.C. for analysis and assay results are expected early in the new year.

The initial 12 holes were located in the southern portion of the Southwest (SW) Vein where infill and down dip extension was the primary focus. Visually, the drilling has been very encouraging and Tempus is pleased to report that infill hole EZ-20-06 intersected the SW Vein from 116.00 m to 121.50 m downhole with visible gold observed over approximately two metres of core length within the quartz vein interval (Figure 2).

The Southwest Vein (Figure 1) hosts the majority of the historical inferred resource at Elizabeth prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”), which comprises 522,843 tonnes grading 12.26 g/t gold, for 206,139 ounces of contained gold (refer to ASX Announcement of 19 August 2019 and disclosure on page 5 for further details).

Tempus is very pleased with the field crews at Elizabeth and thanks them for all their efforts in getting the initial 2,000m drilling completed before the end of the year.

Information in this report relating to Exploration Results is based on information reviewed by Mr. Kevin Piepgrass, who is a Member of the Association of Professional Engineers and Geoscientists of the province of BC (APEGBC), which is a recognised Professional Organisation (RPO), and an employee of Tempus Resources. Mr. Piepgrass has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined by the 2012 Edition of the Australasian Code for reporting of Exploration Results, Mineral Resources and Ore Reserves and as a Qualified Person for the purposes of NI43-101. Mr. Piepgrass consents to the inclusion of the data in the form and context in which it appears.

This announcement has been authorised by the Board of Directors of Tempus Resources Limited.

For further information:

TEMPUS RESOURCES LTD –

Melanie Ross – Director/Company Secretary Phone: +61 8 6188 8181

Figure 1 – Completed Drill holes at Elizabeth

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/7585/70387_tempus1.jpg


Figure 2 – Visible Gold encountered in drill hole EZ-20-06

To view an enhanced version of Figure 2, please visit:
https://orders.newsfilecorp.com/files/7585/70387_tempus2.jpg

About the Blackdome-Elizabeth Gold Project

Tempus is focussed on rapidly verifying and expanding the historical high grade Mineral Resource at the Blackdome-Elizabeth Project in British Columbia by drilling extensions to existing mineralisation and other high priority targets within the 350 km2 licence area, which remains relatively unexplored. Tempus also intends to leverage the existing permitted mill, tailings dam and other infrastructure at Blackdome with the aim of re-commencing production as the Project proceeds.

Forward-Looking Information and Statements

This press release contains certain “forward-looking information” within the meaning of applicable ‎Canadian securities ‎legislation. Such forward-looking ‎information and forward-looking statements are not ‎representative of historical facts or information or current ‎condition, but instead represent only the ‎Company’s beliefs regarding future events, plans or objectives, many of ‎which, by their nature, are ‎inherently uncertain and outside of Tempus’s control. Generally, such forward-looking ‎information or ‎forward-looking statements can be identified by the use of forward-looking terminology such as ‎‎”plans”, ‎‎”expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, ‎‎‎”anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or may ‎contain ‎statements that certain actions, events or results “may”, “could”, “would”, “might” or “will be ‎taken”, “will continue”, ‎‎”will occur” or “will be achieved”. The forward-looking information and forward-‎looking statements contained herein ‎may include, but are not limited to, the continuation of drilling in the Spring of 2021, the receipt of assays from the lab in 2021, the ability of Tempus to successfully achieve business ‎objectives, ‎and expectations ‎for other economic, ‎business, and/or competitive factors.‎ Forward-looking statements and information are subject to various known and unknown risks and uncertainties, many of which are beyond the ability of Tempus to control or predict, that may cause Tempus’ actual results, performance or achievements to be materially different from those expressed or implied thereby, and are developed based on assumptions about such risks, uncertainties and other factors set out herein and the other risks and uncertainties disclosed under the heading “Risk Factors” in the Company’s listing application dated December 3, 2020 filed on SEDAR. Should one or more of these risks, uncertainties or other factors materialize, or should assumptions ‎underlying the ‎forward-looking information or statements prove incorrect, actual results may vary ‎materially from those described ‎herein as intended, planned, anticipated, believed, estimated or ‎expected.‎ Although Tempus believes that the assumptions and factors used in preparing, and the expectations ‎contained ‎in, the forward-looking information and statements are reasonable, undue reliance should not ‎be placed on such ‎information and statements, and no assurance or guarantee can be given that such ‎forward-looking information and ‎statements will prove to be accurate, as actual results and future events ‎could differ materially from those anticipated ‎in such information and statements. The forward-looking ‎information and forward-looking statements contained in this ‎press release are made as of the date of ‎this press release, and Tempus does not undertake to update any ‎forward-looking information ‎and/or forward-looking statements that are contained or referenced herein, except in ‎accordance with ‎applicable securities laws. All subsequent written and oral forward-looking information and ‎statements ‎attributable to Tempus or persons acting on its behalf is expressly qualified in its entirety by this ‎‎notice.‎

Historic Resource Information

The historic inferred resource was disclosed in a technical report prepared for J Pacific Gold by SRK Consulting (Canada) Ltd., Mineral Resource Evaluation, Elizabeth Gold Project, British Columbia. July 22, 2009. Reported at a cut-off grade of 5.0 grams of gold per tonne assuming an underground mining scenario, a ‎gold price of US$1,000 per ounce of gold and 100 percent metallurgical recovery. The QP considers the historical inferred resources reliable because they have been ‎estimated by a long-standing, reputable firm using reasonable parameters and then-current ‎industry best practices. The QP also believes that these historical resources provide historical ‎context and are relevant for the exploration and development of the Project.‎ The Inferred mineral resources are historical estimates and use the categories set out in Section ‎‎1.2 and 1.3 of NI 43-101; however, a qualified person has not completed sufficient work to classify the ‎historical estimate as current mineral resources and the inferred resource should not be relied upon.‎

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Appendix 1 – Drill hole Collar Data

Hole ID Target UTM Easting (NAD83 Z10) UTM Northing (NAD83 Z10) Elevation (m) Length Azimuth Dip
EZ-20-01 SW Vein 531088 5653604 2302 80 125.2 -45
EZ-20-02 SW Vein 531088 5653604 2302 83 107 -45
EZ-20-03 SW Vein 531044 5653603 2302 128 122.8 -45
EZ-20-04 SW Vein 531044 5653603 2302 125 140.1 -50
EZ-20-05 SW Vein 531044 5653603 2302 180 82.3 -60
EZ-20-06 SW Vein 531120 5653660 2339 147 157.8 -65
EZ-20-07 SW Vein 530986 5653598 2302 150 116.5 -52
EZ-20-08 SW Vein 531030 5653720 2360 309 130.5 -54
EZ-20-09 SW Vein 530986 5653598 2302 195 116.5 -65
EZ-20-10 SW Vein 531030 5653720 2360 222 127.7 -45
EZ-20-11 West Vein 531281 5653599 2300 303 100.1 -45
EZ-20-12 SW Vein 531088 5653604 2302 84 104.6 -45

Appendix 2: The following tables are provided to ensure compliance with the JORC Code (2012) requirements for the reporting of Exploration Results for the Blackdome-Elizabeth Gold Project

Section 1: Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary
Sampling techniques
  • Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling.
  • Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.
  • Aspects of the determination of mineralisation that are Material to the Public Report. In cases where ‘industry standard’ work has been done this would be relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (eg submarine nodules) may warrant disclosure of detailed information.
  • HQ (63.5 mm) sized diamond core using standard equipment.
  • Mineralised and potentially mineralised zones, comprising quartz veins, breccias, and alteration zones were sampled.
  • Samples were half core.
  • Typical core samples are 1m in length.
  • Core samples sent to the lab will be crushed and pulverized to 85% passing 75 microns. A 50g pulp will be fire assayed for gold and multi-element ICP. Samples over 10 g/t gold will be reanalysed by fire assay with gravimetric finish
Drilling techniques
  • Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc).
  • Diamond Drilling from surface (HQ size)
Drill sample recovery
  • Method of recording and assessing core and chip sample recoveries and results assessed.
  • Measures taken to maximise sample recovery and ensure representative nature of the samples.
  • Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material.
  • Detailed calculation of recovery was recorded, with most holes achieving over 95%
  • No relationship has yet been noted between recovery and grade and no sample bias was noted to have occurred.
Criteria JORC Code explanation Commentary
Logging
  • Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies.
  • Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography.
  • The total length and percentage of the relevant intersections logged.
  • Detailed geological and geotechnical logging was completed for each hole.
  • All core has been photographed.
  • Complete holes were logged.
Sub-sampling techniques and sample preparation
  • If core, whether cut or sawn and whether quarter, half or all core taken.
  • If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry.
  • For all sample types, the nature, quality and appropriateness of the sample preparation technique.
  • Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.
  • Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field duplicate/second-half sampling.
  • Whether sample sizes are appropriate to the grain size of the material being sampled.
  • Half core was sampled, using a core saw.
  • Duplicate samples of new and historical core are Quarter core
  • Sample sizes are considered appropriate for the grain size of the material being sampled.
  • It is expected that bulk sampling will be utilised as the project advances, to more accurately determine grade
Quality of assay data and laboratory tests
  • The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total.
  • For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc.
  • Nature of quality control procedures adopted (eg standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and precision have been established.
  • Core samples that have been sent to the lab for analysis include control samples (standards, blanks and prep duplicates) inserted at a minimum rate of 1:10 samples.
  • In addition to the minimum rate of inserted control samples, a standard or a blank is inserted following a zone of mineralization or visible gold
Verification of sampling and assaying
  • The verification of significant intersections by either independent or alternative company personnel.
  • The use of twinned holes.
  • Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols.
  • Discuss any adjustment to assay data.
  • Re-assaying of selected intervals of historic core will be undertaken
Criteria JORC Code explanation Commentary
Location of data points
  • Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation.
  • Specification of the grid system used.
  • Quality and adequacy of topographic control.
  • All sampling points were surveyed using a hand held GPS.
  • UTM grid NAD83 Zone 10.
  • A more accurate survey pickup will be completed at the end of the program, to ensure data is appropriate for geological modelling and Resource Estimation.
  • Down hole surveys have been completed on all holes.
Data spacing and distribution
  • Data spacing for reporting of Exploration Results.
  • Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied.
  • Whether sample compositing has been applied.
  • Most drilling is targeting verification and extension of known mineralisation.
  • It is expected that the data will be utilised in a preparation of a Mineral Resource statement.
  • Exploration beneath geochemical anomalies would require further delineation drilling to be incorporated in a Mineral Resource.
Orientation of data in relation to geological structure
  • Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type.
  • If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material.
  • In general, the aim was to drill perpendicular to the mineralised structures, to gain an estimate of the true thickness of the mineralised structures.
  • At several locations, a series (fan) of holes was drilled to help confirm the orientation of the mineralised structures and to keep land disturbance to a minimum.
Sample security
  • The measures taken to ensure sample security.
  • Samples from Elizabeth are delivered to the laboratory by a commercial transport service.
Audits or reviews
  • The results of any audits or reviews of sampling techniques and data.
  • An independent geological consultant has recently visited the site as part of preparing an updated NI43-101 Technical Report for the Project.

Section 2: Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral tenement and land tenure status
  • Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings.
  • The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area.
  • The Blackdome-Elizabeth Project is comprised of 73 contiguous mineral claims underlain by 14 Crown granted mineral claims and two mining leases.
  • The Property is located in the Clinton and Lillooet Mining Divisions approximately 230 km NNE of Vancouver
  • Tempus’ rights to key parts of the Elizabeth Gold Project derive from an option agreement with private individuals (refer to ASX announcement 11 November 2019)
  • A net smelter royalty of 3% NSR (1-2% purchasable depending on claim) applies to several claims on the Elizabeth Property.
  • No royalties apply to the Blackdome Property or Elizabeth Regional Properties.
  • There are currently no known impediments to developing a project in this area, and all tenure is in good standing.
Exploration done by other parties
  • Acknowledgment and appraisal of exploration by other parties.
  • In the 1940s, placer gold was discovered in Fairless Creek west of Blackdome Summit. Prospecting by Lawrence Frenier shortly afterward led to the discovery of gold-bearing quartz veins on the southwest slope of the mountain that resulted in the staking of mining claims in 1947. Empire Valley Gold Mines Ltd and Silver Standard Resources drove two adits and completed basic surface work during the 1950s.
  • The Blackdome area was not worked again until 1977 when Barrier Reef Resources Ltd. re-staked the area and performed surface work in addition to underground development. The Blackdome Mining Corp. was formed in 1978 and performed extensive surface and underground work with various joint venture partners that resulted in a positive feasibility study. A 200 ton/day mill, camp facilities and tailings pond were constructed and mining operations officially commenced in 1986. The mine ceased operations in 1991, having produced 225,000 oz of Au and 547,000 oz of Ag from 338,000 tons of ore (Godard et al., 2010)
  • After a period of inactivity, Claimstaker Resources Ltd. took over the project, reopening the mine in late 1998. Mining operations lasted six months and ended in May of 1999. During this period, 6,547 oz of Au and 17,300 oz of Ag were produced from 21,268 tons of ore. Further exploration programs were continued by Claimstaker over the following years and a Japanese joint venture partner was brought onboard that prompted a name change to J-Pacific Gold Inc. This partnership was terminated by 2010, resulting in another name change to Sona Resources Corp.
  • Gold-bearing quartz veins were discovered near Blue Creek in 1934, and in 1940-1941 the Elizabeth No. 1-4 claims were staked.
  • Bralorne Mines Ltd. optioned the property in 1941 and during the period 1948-1949, explored the presently-named Main and West Veins by about 700 metres of cross-cutting and drifting, as well as about 110 metres of raises.
  • After acquiring the Elizabeth Gold Project in 2002, J-Pacific (now Sona) has conducted a series of exploration programs that included diamond drilling 66 holes totalling 8962.8 metres (up until 2009) Other exploration work by Sona at the Elizabeth Gold Project has included two soil grid, stream sediment sampling, geological mapping and sampling, underground rehabilitation, structural mapping and airborne photography and topographic base map generation.
Criteria JORC Code explanation Commentary
Geology
  • Deposit type, geological setting and style of mineralisation.
  • The Blackdome property is situated in a region underlain by rocks of Triassic to Tertiary age. Sedimentary and igneous rocks of the Triassic Pavilion Group occurring along the Fraser River represent the oldest rocks in the region. A large, Triassic age, ultramafic complex (Shulaps Complex) was emplaced along the Yalakom fault; a regional scale structure located some 30 kilometres south of the property. Sediments and volcanics of the Cretaceous Jackass Mountain Group and Spences Bridge/Kingsvale Formations overlie the Triassic assemblages. Some of these rocks occur several kilometres south of Blackdome.
  • Overlying the Cretaceous rocks are volcanics and minor sediments of Eocene age. These rocks underlie much of Blackdome and are correlated with the Kamloops Group seen in the Ashcroft and Nicola regions. Geochemical studies (Vivian, 1988) have shown these rocks to be derived from a “calc-alkaline” magma in a volcanic arc type tectonic setting. Eocene age granitic intrusions at Poison Mountain some 22 kilometres southwest of Blackdome are host to a gold bearing porphyry copper/molybdenum deposit. It is speculated that this or related intrusions could reflect the source magmas of the volcanic rocks seen at Blackdome. There is some documented evidence of young granitic rocks several kilometres south of the mine near Lone Cabin Creek. The youngest rocks present are Oligocene to Miocene basalts of the Chilcotin Group. These are exposed on the uppermost slopes of Blackdome Mountain and Red Mountain to the south.
  • Transecting the property in a NE-SW strike direction are a series of faults that range from vertical to moderately westerly dipping. These faults are the principal host structures for Au- Ag mineralisation. The faults anastomose, and form sygmoidal loops.
  • The area in which the Elizabeth Gold Project is situated is underlain by Late Paleozoic to Mesozoic rock assemblages that are juxtaposed across a complex system of faults mainly of Cretaceous and Tertiary age. These Paleozoic to Mesozoic-age rocks are intruded by Cretaceous and Tertiary-age stocks and dykes of mainly felsic to intermediate composition, and are locally overlain by Paleogene volcanic and sedimentary rocks. The Elizabeth Gold Project is partly underlain by ultramafic rocks of the Shulaps Ultramafic Complex, which include harzburgite, serpentinite and their alteration product listwanite.
  • The gold mineralisation found on the Elizabeth Gold Project present characteristics typical of epigenetic mesothermal gold deposits. The auriferous quartz vein mineralisation is analogous to that found in the Bralorne-Pioneer deposits. Gold mineralisation is hosted by a series of northeast trending, steeply northwest dipping veins that crosscut the Blue Creek porphyry intrusion. The Main and West vein systems display mesothermal textures, including ribboned-laminated veins and comprehensive wall rock breccias. Vein formation and gold mineralisation were associated with extensional-brittle faulting believed to be contemporaneous with mid-Eocene extensional faulting along the Marshall Creek, Mission Ridge and Quartz Mountain faults.
Criteria JORC Code explanation Commentary
Drill hole Information
  • A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes:
    • easting and northing of the drill hole collar
    • elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole collar
    • dip and azimuth of the hole
    • down hole length and interception depth
    • hole length.
  • If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case.
  • Refer to Appendix 1 for drill hole collar information
Data aggregation methods
  • In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (eg cutting of high grades) and cut-off grades are usually Material and should be stated.
  • Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail.
  • The assumptions used for any reporting of metal equivalent values should be clearly stated.
  • No assays reported
Relationship between mineralisation widths and intercept lengths
  • These relationships are particularly important in the reporting of Exploration Results.
  • If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported.
  • If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (eg ‘down hole length, true width not known’).
  • In general, drilling is designed to intersect the mineralized zone at a normal angle, but this is not always possible.
  • For the reported intervals, true widths are not currently known
Diagrams
  • Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views.
  • Refer to maps within announcement for drill hole locations.
Criteria JORC Code explanation Commentary
Balanced reporting
  • Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results.
  • No assays reported.
Other substantive exploration data
  • Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples – size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances.
  • Not applicable.
Further work
  • The nature and scale of planned further work (eg tests for lateral extensions or depth extensions or large-scale step-out drilling).
  • Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive.
  • Tempus plans to update historical NI43-101 foreign resource estimates to current NI43-101 and JORC 2012 standards
  • Tempus is also seeking to expand the scale of the mineralisation at the project through further exploration.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/70387

Disclaimer

Before downloading, printing or viewing the Prospectus, please carefully read this information. By accessing the Prospectus (by clicking on the link below) you agree to and acknowledge that you have read and accept these terms and conditions of access. The information on this page is not part of the Prospectus. If you do not understand it, you should consult your professional adviser without delay.

Important Notice

Tempus Resources Ltd (ACN 625 645 338) (Company) has lodged a prospectus dated 4 August 2022 (Prospectus) with the Australian Securities and Investments Commission (ASIC) in respect of a pro-rata non-renounceable entitlement issue of 1 Share for every 2 Shares held by those Shareholders registered at the Record Date at an issue price of $0.05 per Share together with 1 free New Option for every Share applied for and issued to raise up to $3,898,286 (based on the number of Shares on issue as at the date of the Prospectus) (Offer).

The Prospectus also contains the following offers:

(a) an offer of 20,338,885 Options available to sophisticated and professional investors who participated in the placement announced by the Company on 27 July 2022 (Placement) on the basis of one (1) free attaching Option for every Share subscribed for under the Placement (Placement Options Offer); and

(b) an offer of 16,000,000 Options available to Peloton Capital Pty Ltd (ACN 149 540 018) (AFSL:406040) and Aesir Corporate Pty Ltd (ACN 615 591 976) a Corporate Authorised Representative (AR: 001269084) for Urd Services Pty Ltd (AFSL:511904) (or their nominees) in consideration for their services as joint lead managers to the Placement and the Offer (Lead Manager Options Offer), (together, the Offers).

The Company has specified a target market (Target Market) for investors under the Offers, which is set out in the target market determination available at (TMD). The Prospectus can only be accessed by investors in the TMD.

The Prospectus and TMD are an important document which should be read in its entirety. If, after reading the Prospectus you have questions about the Offers, TMD or any other matter, please contact your professional advisers without delay.

Neither ASIC nor ASX Limited, nor any of their respective officers, take any responsibility for the contents of the Prospectus or the merits of the investment to which the Prospectus relates.

The electronic copy of the Prospectus available on this website does not constitute an offer of, or an invitation to subscribe for, any securities. You may print out a hard copy of the Prospectus from this website or copy the electronic Prospectus on this website into an electronic file for your personal use only. You must not alter the contents of this electronic file in any way.

Alternatively, you may obtain a hard copy of the Prospectus free of charge by contacting the Company by phone on + 61 8 6188 8181 during office hours or by emailing the Company at info@tempusresources.com.au. To the extent permitted by law, the Company is not liable for any loss incurred from accessing or downloading the Prospectus from this website, including, but not limited to, data corruption or download.

Entitlement and Acceptance

Anyone who wants to take up their entitlement and apply for shortfall securities beyond their entitlement will need to carefully consider the TMD and Prospectus and complete the personalised Entitlement and Acceptance attached to or accompanied by the Prospectus (Acceptance Form) or pay the applications monies in accordance with the details set out in the Prospectus and Acceptance Form. The Corporations Act 2001 (Cth) prohibits any person from passing onto another person an Acceptance Form unless it is attached to or accompanied by a complete and unaltered version of a prospectus.

The Company reserves the right not to accept Acceptance Form or payment of application monies from a person if it has reason to believe that when that person was given access to the electronic Acceptance Form, it was not provided together with the electronic Prospectus and any relevant supplementary or replacement prospectus or any of those documents were incomplete or altered.

If an Acceptance Form is not completed correctly, or if the accompanying payment is the wrong amount, the Company may, in its discretion, still treat the Acceptance Form to be valid. The Company’s decision to treat an acceptance as valid, and how to construe, amend or complete the Acceptance Form, will be final.

No Advice

Nothing contained on this website or in the Prospectus constitutes investment, legal, business, tax or other advice. In particular, the information on this website and in the Prospectus does not take into account your financial or investment objectives, financial situation or particular needs. In making an investment decision, you must rely on your own examination of the Company, the securities being offered for and the terms of the offering, including the merits and risks involved. You should consult your professional advisers for investment, legal, business, tax or other advice.

Persons to whom Offer is available

For legal reasons, the electronic version of the Prospectus accessible through this website is available to persons accessing this website from within Australia and New Zealand only. If you are accessing this website from anywhere outside Australia or New Zealand, please do not download the electronic version of the Prospectus.

The Prospectus does not constitute an offer, or invitation to apply for, of securities in any jurisdiction where, or to any person to whom, it would not be lawful to issue the Prospectus or to make the offer or invitation. It is the responsibility of any applicant outside Australia or New Zealand to ensure compliance with all laws of any country relevant to their applications, and any such applicant should consult their professional advisers as to whether any government or other consents are required, or whether any formalities need to be observed to enable them to apply for and be allotted any securities.

It is not practicable for the Company to comply generally with the securities laws of overseas jurisdictions having regard to the number of overseas shareholders, the number and value of securities those shareholders would be offered and the cost of complying with regulatory requirements in each relevant jurisdiction. Accordingly, the offer pursuant to the Prospectus is only being extended and securities will only be issued to shareholders with a registered address in Australia or New Zealand.

Acknowledgement

By clicking “I Accept” below, you acknowledge and agree that:

  • You have read and understood the TMD and that you either fall within the Target Market or, if you do not fall within the Target Market, you are accessing the Prospectus for information purposes only and that you will not make an application under the Offer.
  • You have read and understood the TMD and that you either fall within the Target Market or, if you do not fall within the Target Market, you are accessing the Prospectus for information purposes only and that you will not make an application under the Offer.
  • You are an Australian or New Zealand resident and you are requesting a copy of the Prospectus from within Australia or New Zealand;
    or
    If you are a non-Australian resident, you have consulted your professional adviser as to whether any governmental or other consents are required or whether any other formalities need to be considered and followed before accessing the Prospectus; and
  • You will not pass onto any other person the Acceptance Form unless it is attached to or accompanied by the complete and unaltered electronic version of the Prospectus and the TMD.